Every gazetted zoning and overlay change in Stonnington since 3 Aug 2017.

13changes allowing more housing
15changes allowing less housing
41overlay changes
25 Jun 2026most recent gazetted change

Every gazetted zoning and overlay change in Stonnington since 3 Aug 2017, grouped by suburb. Part of the statewide Victoria Rezoning Tracker.

Allows more housing, 31 Mar 2026Allows more housing, 31 Mar 2026Taken out of housing, 31 Mar 2026Allows more housing, 31 Mar 2026Allows more housing, 31 Mar 2026Allows more housing, 11 Apr 2025Allows more housing, 11 Apr 2025Allows more housing, 11 Apr 2025Schedule change (same zone), 12 Nov 2020Taken out of housing, 7 Jun 2018Taken out of housing, 13 Mar 2026Taken out of housing, 13 Mar 2026Taken out of housing, 11 Feb 2021Taken out of housing, 11 Feb 2021Taken out of housing, 7 Jun 2018Taken out of housing, 10 Aug 2017Allows more housing, 10 Aug 2017Allows more housing, 31 Mar 2026Allows more housing, 31 Mar 2026Rezoned, similar housing capacity, 31 Mar 2026Allows more housing, 31 Mar 2026Allows more housing, 31 Mar 2026Taken out of housing, 13 Mar 2026Taken out of housing, 18 Apr 2024Schedule change (same zone), 27 Sep 2018Taken out of housing, 13 Mar 2026Schedule change (same zone), 12 Nov 2020Taken out of housing, 20 Sep 2019Allows more housing, 10 Aug 2017Allows less housing, 10 Aug 2017Taken out of housing, 10 Aug 2017Schedule change (same zone), 27 Sep 2018Schedule change (same zone), 27 Sep 2018Taken out of housing, 7 Jun 2018
More housingLess housingSchedule changeOther zone change

46 of 75 changes matched to a single amendment, 12 ambiguous. See every amendment to this scheme →

Changes by suburb

Malvern East (10, latest 31 Mar 2026)

Malvern East suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
31 Mar 2026Allows more housingMalvern EastNRZ4 → HCTZ2111.2 haAmendment GC270
31 Mar 2026Allows more housingMalvern EastNRZ2 → HCTZ1110.6 haAmendment GC270
31 Mar 2026Taken out of housingMalvern EastNRZ2 → PPRZ41.1 haAmendment GC270
31 Mar 2026Allows more housingMalvern EastGRZ10 → C1Z11.5 haAmendment GC270
31 Mar 2026Allows more housingMalvern East, Glen Iris, MalvernGRZ10 → HCTZ2437.2 haAmendment GC270
11 Apr 2025Allows more housingMalvern EastGRZ10 → HCTZ1233.9 haAmendment GC252
11 Apr 2025Allows more housingMalvern EastGRZ1 → HCTZ215,479 m²Amendment GC252
11 Apr 2025Allows more housingMalvern EastNRZ2 → HCTZ2155.7 haAmendment GC252
12 Nov 2020Schedule change (same zone)Malvern EastNRZ2 → NRZ538.2 haAmendment C285ston
7 Jun 2018Taken out of housingMalvern East, ArmadaleGRZ10 → PPRZ23,466 m²2 amendments gazetted that day

* dated by when the record took effect; no gazettal date within two weeks was found.

South Yarra (7, latest 13 Mar 2026)

South Yarra suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Mar 2026Taken out of housingSouth YarraGRZ12 → PPRZ1734 m²Amendment C339stonPt1
13 Mar 2026Taken out of housingSouth YarraGRZ1 → PPRZ1533 m²Amendment C339stonPt1
11 Feb 2021Taken out of housingSouth YarraRGZ1 → PPRZ1356 m²Amendment C272ston
11 Feb 2021Taken out of housingSouth YarraGRZ10 → PPRZ1268 m²Amendment C272ston
7 Jun 2018Taken out of housingSouth YarraNRZ3 → PPRZ3858 m²2 amendments gazetted that day
10 Aug 2017Taken out of housingSouth YarraGRZ1 → PPRZ1308 m²Amendment C172
10 Aug 2017Allows more housingSouth Yarra, Prahran, WindsorC1Z → ACZ11077.4 haAmendment C172

* dated by when the record took effect; no gazettal date within two weeks was found.

Glen Iris (5, latest 31 Mar 2026)

Glen Iris suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
31 Mar 2026Allows more housingGlen Iris, Malvern EastNRZ2 → HCTZ2777.8 haAmendment GC270
31 Mar 2026Allows more housingGlen Iris, MalvernGRZ3 → HCTZ124.4 haAmendment GC270
31 Mar 2026Rezoned, similar housing capacityGlen Iris, Malvern EastRGZ1 → HCTZ121.4 haAmendment GC270
31 Mar 2026Allows more housingGlen Iris, Malvern EastGRZ7 → HCTZ1310.8 haAmendment GC270
31 Mar 2026Allows more housingGlen Iris, Malvern, Malvern EastGRZ10 → HCTZ110147 haAmendment GC270

* dated by when the record took effect; no gazettal date within two weeks was found.

Malvern (3, latest 13 Mar 2026)

Malvern suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Mar 2026Taken out of housingMalvernNRZ4 → PPRZ1395 m²Amendment C339stonPt1
18 Apr 2024Taken out of housingMalvernRGZ2 → SUZ213.3 haAmendment C333ston
27 Sep 2018Schedule change (same zone)MalvernGRZ3 → GRZ1512.0 ha2 amendments gazetted that day

* dated by when the record took effect; no gazettal date within two weeks was found.

Prahran (3, latest 13 Mar 2026)

Prahran suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Mar 2026Taken out of housingPrahranACZ1 → PPRZ1451 m²Amendment C339stonPt1
12 Nov 2020Schedule change (same zone)PrahranNRZ3 → NRZ511.9 haAmendment C285ston
20 Sep 2019Taken out of housingPrahranACZ1 → PPRZ41,400 m²2 amendments gazetted that day

* dated by when the record took effect; no gazettal date within two weeks was found.

Windsor (3, latest 10 Aug 2017)

Windsor suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Aug 2017Allows more housingWindsorRGZ1 → ACZ114,174 m²Amendment C172
10 Aug 2017Allows less housingWindsorC1Z → GRZ1712,121 m²Amendment C172
10 Aug 2017Taken out of housingWindsorC1Z → PUZ61691 m²Amendment C172

* dated by when the record took effect; no gazettal date within two weeks was found.

Armadale (2, latest 27 Sep 2018)

Armadale suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
27 Sep 2018Schedule change (same zone)ArmadaleGRZ10 → GRZ1511,214 m²2 amendments gazetted that day
27 Sep 2018Schedule change (same zone)ArmadaleRGZ2 → RGZ321.4 ha2 amendments gazetted that day

* dated by when the record took effect; no gazettal date within two weeks was found.

Toorak (1, latest 7 Jun 2018)

Toorak suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Jun 2018Taken out of housingToorakNRZ2 → PPRZ1830 m²2 amendments gazetted that day

* dated by when the record took effect; no gazettal date within two weeks was found.

Overlay changes

GazettedChangeSuburbZoneParcelsAreaAmendment
25 Jun 2026Heritage schedule changedMalvern, Armadale, Glen IrisHO19–Amendment C316ston
25 Jun 2026*Heritage control removedMalvernHO1–See scheme amendments
11 Jun 2026New heritage controlArmadale, Malvern, ToorakHO10–Amendment C320ston
11 Jun 2026Heritage schedule changedToorak, Armadale, KooyongHO31–Amendment C320ston
11 Jun 2026*Heritage control removedToorakHO1–See scheme amendments
29 Nov 2025*Heritage control removedArmadaleHO1–See scheme amendments
30 Jul 2025*Heritage control removedToorakHO4–See scheme amendments
24 Oct 2024New heritage controlPrahranHO1–Amendment C345ston
20 Jun 2024*Heritage control removedArmadale, ToorakHO4–See scheme amendments
7 Mar 2024Heritage schedule changedToorakHO1–Amendment C332ston
30 Mar 2023New heritage controlArmadale, Glen Iris, PrahranHO5–Amendment C304ston
30 Mar 2023Heritage schedule changedSouth YarraHO2–Amendment C304ston
24 Feb 2023*Heritage control removedArmadale, ToorakHO3–See scheme amendments
24 Feb 2023*Flood control removedSBO1–See scheme amendments
9 Feb 2023*Heritage control removedMalvernHO3–See scheme amendments
25 Nov 2022New heritage controlToorak, ArmadaleHO24–Amendment C319ston
25 Aug 2022*Flood control removedMalvern EastSBO1–See scheme amendments
30 Jun 2022New heritage controlToorakHO1–Amendment C321ston
20 May 2022New heritage controlArmadale, ToorakHO2–2 amendments gazetted that day
24 Feb 2022New heritage controlMalvern, Glen IrisHO22–Amendment C315ston
20 Nov 2020New heritage controlToorakHO1–Amendment C308ston
27 Mar 2020*Heritage control removedSouth YarraHO1–See scheme amendments
12 Dec 2019New heritage controlWindsorHO1–3 amendments gazetted that day
13 Jun 2019New flood controlMalvern East, Armadale, Glen Iris +3 moreSBO34–Amendment C221
13 Jun 2019Flood schedule changedMalvern East, Armadale, Glen Iris +7 moreSBO81–Amendment C221
13 Jun 2019New flood controlLSIO1–Amendment C221
13 Jun 2019*Flood control removedPrahran, Glen Iris, Malvern +2 moreSBO9–See scheme amendments
13 Jun 2019Flood schedule changedToorak, Glen Iris, Hawthorn East +4 moreLSIO20–Amendment C221
13 Jun 2019*Flood control removedToorak, Glen Iris, MalvernLSIO6–See scheme amendments
28 Mar 2019New heritage controlWindsor, Armadale, Glen Iris +1 moreHO4–Amendment C283ston
29 Nov 2018New heritage controlSouth YarraHO4–Amendment C277
12 Jul 2018New heritage controlArmadaleHO1–Amendment C279ston
11 Jul 2018*Heritage control removedArmadaleHO1–See scheme amendments
7 Jun 2018New heritage controlMalvern, ArmadaleHO2–2 amendments gazetted that day
6 Jun 2018*Heritage control removedMalvern, ArmadaleHO3–See scheme amendments
7 Feb 2018*Heritage control removedMalvern, Prahran, ToorakHO4–See scheme amendments
25 Jan 2018New heritage controlGlen Iris, Armadale, Malvern +5 moreHO101–4 amendments gazetted that day
24 Jan 2018*Heritage control removedKooyongHO1–See scheme amendments
12 Oct 2017New heritage controlKooyongHO1–2 amendments gazetted that day
12 Sep 2017*Heritage control removedArmadaleHO4–See scheme amendments
3 Aug 2017New heritage controlMalvernHO1–Amendment C256

* dated by when the record took effect; no gazettal date within two weeks was found.

Filter these changes

Change type
GazettedChangeSuburbCouncilZoneParcelsArea

Method, dating and limits

Method. Delora's own method, not an official classification. Each zone family is ranked by how much housing it generally allows (rural 1, low-density 2, neighbourhood and township 3, general residential 4, residential growth and housing choice 5, mixed use and commercial 1 6, activity centre and precinct 7, urban growth 8). A change to a higher rank reads as allowing more housing, to a lower rank as allowing less. Moving land out of every ranked zone (for example into an industrial or public-use zone) counts as taken out of housing, and the reverse as opened to housing. Urban Growth land that receives its permanent zone once a precinct is built out is shown separately, not as a downzoning. A change of schedule within one zone (GRZ1 to GRZ2) can tighten or loosen the local rules, so it gets no verdict. Legacy recodes (R1Z to GRZ, RDZ to TRZ) and moves between road, rail and public-land zones are administrative and excluded from the counts.

How a change is dated. Where the service records a gazettal date for the new zone or overlay within two weeks of it taking effect, that gazettal date is shown. Otherwise the date the new record took effect is shown instead, and marked as such on the notice.

Amendment numbers. Matched to a notice when exactly one planning scheme amendment was gazetted for that council on that date; shown as ambiguous when several were, and never guessed. There is no amendment-number field in the source data itself.

  • FZ/RAZ/RCZ/GWZ/GWAZ/RUZ/RLZ — Rural and green-wedge zones: at most one dwelling on a large lot, often needing a permit.
  • LDRZ — Low Density Residential: houses on large lots (typically 0.4 ha or more) with limited subdivision.
  • NRZ/TZ — Neighbourhood Residential and Township: detached housing with limited growth; the most restrictive urban residential zones.
  • GRZ/R1Z/R2Z/R3Z — General Residential (and the pre-2014 Residential 1-3 codes it replaced): moderate growth such as townhouses and dual occupancies.
  • RGZ/HCTZ — Residential Growth, and Housing Choice and Transport: zones designated for more housing, with apartments and greater height.
  • MUZ/C1Z/B1Z/B2Z/B5Z/CDZ/PDZ/CCZ/DZ — Mixed use, Commercial 1 and the comprehensive or precinct zones: apartments above or beside other uses, usually in centres.
  • ACZ/PRZ — Activity Centre and Precinct: the highest-density urban zones, applied to major centres and precincts planned for intensive change.
  • UGZ/UFZ — Urban Growth: greenfield land being turned into whole new suburbs under a precinct structure plan.

Honest limits.

  • Zone-polygon history runs from 30 Jul 2017 onwards; earlier changes are gazettal records only, without a mapped boundary.
  • Overlay history covers heritage, floodway, land subject to inundation, special building and bushfire management only — not every overlay type in the planning scheme.
  • This shows the zone or overlay that applies. It does not say what a planning permit will allow — that depends on the zone schedule, any overlay and the specific proposal.