Delora

Deciding what to buy

Building a new home: contracts, insurance and payments by state

Builder's insurance, deposit limits, progress payments and defect cover when you build a new home in Victoria, New South Wales, Queensland, Western Australia and South Australia.

Jurisdiction: Victoria, New South Wales, Queensland, Western Australia and South Australia, compared; Tasmania, the ACT and the Northern Territory notedSources last verified: 22 Oct 2026By Delora editorial teamChange history

Key points

The rules, state by state

Each state sets its own rules for building contracts and builder's insurance. The table gives the headline rule at each step for a typical new home; the sections below and the official pages give the detail and the exceptions. Each cell links to the government page it comes from.

Scroll sideways for more columns

The rules, state by state
StepVICNSWQLDWASA
Builder's insuranceHome Warranty, for work over $20,000 under contracts signed from 1 July 2026 (Building and Plumbing Commission (Victoria), verified 22 Oct 2026)Home building compensation, for work over $20,000 (State Insurance Regulatory Authority (SIRA) NSW, verified 22 Oct 2026)Home warranty insurance, for work over $3,300 (Queensland Building and Construction Commission, verified 22 Oct 2026)Home indemnity insurance, for work over $20,000 (Department of Local Government, Industry Regulation and Safety (WA), verified 22 Oct 2026)Building indemnity insurance, for work of $20,000 or more that needs approval (Government of South Australia, verified 22 Oct 2026)
When the insurance paysIncomplete, defective or non-compliant work; not limited to the builder having died, disappeared or become insolvent (Building and Plumbing Commission (Victoria), verified 22 Oct 2026)Builder has died, become insolvent, disappeared, or had their licence suspended over a money order (State Insurance Regulatory Authority (SIRA) NSW, verified 22 Oct 2026)Contractor does not or cannot finish; defective work the contractor does not fix; subsidence (Queensland Building and Construction Commission, verified 22 Oct 2026)Builder dies, disappears or becomes insolvent (Department of Local Government, Industry Regulation and Safety (WA), verified 22 Oct 2026)Builder dies, disappears or becomes insolvent (Government of South Australia, verified 22 Oct 2026)
Most it pays$400,000 in total per home (Building and Plumbing Commission (Victoria), verified 22 Oct 2026)$340,000 (limits apply) (State Insurance Regulatory Authority (SIRA) NSW, verified 22 Oct 2026)$200,000 (Queensland Building and Construction Commission, verified 22 Oct 2026)Completion of the work up to $200,000; loss of a deposit up to $40,000 (Department of Local Government, Industry Regulation and Safety (WA), verified 22 Oct 2026)SA.GOV.AU states no cover limit (Government of South Australia, verified 22 Oct 2026); QBE's policy limit to increase to $250,000 (July 2025 release) (Consumer and Business Services (SA), verified 22 Oct 2026)
How long cover lasts6 years for major defects, 2 years for other defects (Building and Plumbing Commission (Victoria), verified 22 Oct 2026)6 years for major defects, 2 years for other losses (State Insurance Regulatory Authority (SIRA) NSW, verified 22 Oct 2026)6 years and 6 months (Queensland Building and Construction Commission, verified 22 Oct 2026)Six years from practical completion (Department of Local Government, Industry Regulation and Safety (WA), verified 22 Oct 2026)Defective-work claims usually up to 5 years (Government of South Australia, verified 22 Oct 2026)
Largest deposit5% on contracts of $20,000 or more (10% under) (Consumer Affairs Victoria, verified 22 Oct 2026)10 percent (NSW Government (NSW Fair Trading), verified 22 Oct 2026)5% on $20,000 or more (Queensland Building and Construction Commission, verified 22 Oct 2026)6.5 per cent (contracts $7,500 to $500,000) (Building and Energy (WA), verified 22 Oct 2026)No more than 5% on contracts of $20,000 or more (Government of South Australia (Attorney-General's Department), verified 12 Aug 2026)
Progress paymentsSet stages and percentages; you pay for completed stages (Consumer Affairs Victoria, verified 22 Oct 2026); new laws take effect by 1 December 2026 (Consumer Affairs Victoria, verified 22 Oct 2026)Must match the work carried out (NSW Government (NSW Fair Trading), verified 22 Oct 2026)Should match the work actually completed (Queensland Building and Construction Commission, verified 22 Oct 2026)Only for work performed or materials supplied (Building and Energy (WA), verified 22 Oct 2026)Pay against an invoice once work is completed (Government of South Australia (Attorney-General's Department), verified 12 Aug 2026)
Check the builderBuilding and Plumbing Commission register of building practitioners (Building and Plumbing Commission (Victorian Building Authority), verified 29 Jul 2026)NSW Fair Trading Verify licence register (NSW Government (NSW Fair Trading), verified 18 Aug 2026)QBCC licensee register (Queensland Building and Construction Commission, verified 12 Aug 2026)Building and Energy licence and registration search (Consumer Protection WA (Government of Western Australia), verified 12 Aug 2026)Consumer and Business Services register of licensed builders (Government of South Australia (Attorney-General's Department), verified 12 Aug 2026)

Victoria in full, including the payment-stage percentages and the reforms due by 1 December 2026: building a new home in Victoria.

A house-and-land package is still two contracts

A package is sold as one product, but Victorian and South Australian government guidance both describe it as more than one contract.

  • Consumer Affairs Victoria says house and land packages generally involve at least two contracts, one to buy the land and one to build the house. Building can only start when the plan of subdivision is registered; you can cancel the land contract if the subdivision is not registered within 18 months of signing (or by a date in the contract), and your building obligations should not start until registration. The builder must obtain a soil report and foundation data, and you should not have to pay extra later for work the builder should have foreseen from it. (Consumer Affairs Victoria, verified 22 Oct 2026)
  • The SA Government's HomeSeeker SA says house-and-land packages normally have a 2-part contract, one for the land and one for the house, each typically with its own deposit, and that a buyer may only have to pay stamp duty on the price of the land, not the value of the house. Approvals can take anywhere from two weeks to 12 months, the final price can rise through variations, and it suggests a contingency of at least 5 to 10 percent of the budget. (SA Housing Authority (HomeSeeker SA), verified 22 Oct 2026)

Insurance before money

In each state below, the insurance, or the certificate for it, comes before a step the state names: a payment, the deposit or the start of work.

  • For eligible Victorian projects the registered builder must pay the Home Warranty premium before the earlier of 10 business days after the building contract is signed or the work starting; not doing so is an offence. Once the Building and Plumbing Commission accepts the premium it issues a Notice of Cover to the building owner. A homeowner may still be protected even if the builder does not pay the premium. (Building and Plumbing Commission (Victoria), verified 22 Oct 2026)
  • The NSW Government says not to make payments until home building compensation cover is in place, that a builder can only seek a deposit of at most 10% of the total contract price before work starts, and that consumers should only make authorised progress payments. A payment for plans before signing is generally not covered by home building compensation cover. (NSW Government (Building Commission NSW), verified 22 Oct 2026)
  • In WA, residential building work valued over $20,000 needs home indemnity insurance. It covers completion of the work up to $200,000 (or the contract value if lower) and loss of a deposit up to $40,000, for six years from practical completion, and comes into effect only if the builder dies, disappears or becomes insolvent (or, for a company, ceases to exist or becomes insolvent). The builder must give the owner the certificate before starting work or asking for a deposit; it protects later owners. (Department of Local Government, Industry Regulation and Safety (WA), verified 22 Oct 2026)
  • In SA, domestic building work that needs approval and costs $20,000 or more must be covered by building indemnity insurance, which the builder arranges and pays for. It applies if the builder dies, disappears or becomes insolvent, and defective-work claims can usually be made up to 5 years from completion. Building work cannot start until the owner and the council have a copy of the certificate. The SA.GOV.AU page states no cover limit. (Government of South Australia, verified 22 Oct 2026)

Tasmania, the ACT and the Northern Territory

These three are not in the table. What Delora's sources say about each:

  • In the ACT, building work on houses and apartment buildings of three storeys and below must be covered by residential building work insurance, from an authorised insurer or an approved fidelity fund scheme. From 1 January 2025 the minimum insurance amount increased from $85,000 to $200,000 and the claim time limit from 90 days to 180 days; the time limit starts when the homeowner becomes aware that the builder has become insolvent, died or disappeared. The insurance covers the current owner and future owners. (ACT Government (City and Environment Directorate, Planning), verified 22 Oct 2026)
  • In the Northern Territory, owners of new homes (including duplexes and units in complexes up to 3 storeys, plus extensions or renovations to those buildings) must have residential building cover protecting against defective or incomplete work, under the Building Act 1993 -- obtained via a fidelity fund certificate. (Northern Territory Government, verified 12 Aug 2026)
  • In August 2024 the Tasmanian Government announced the reintroduction of a mandatory, last-resort Home Warranty Insurance Scheme for residential building contracts over $20,000, expected to take effect in mid-2025. (Premier of Tasmania, verified 22 Oct 2026)

Delora could not find a current official page confirming that Tasmania's scheme has started. Ask Building Standards Tasmania, or the builder's insurer, before you sign.

Practical checklist

Before you sign a building contract, in any state

  • Use the rules for the state where the home is being built
  • Check the builder's licence or registration on the state register
  • Get the insurance certificate or notice of cover before you pay a deposit
  • Compare the deposit and each progress payment with the limits for your state
  • Have a building lawyer read the contract, including any land contract in a package

Questions for a professional

  • Which state's building contract rules apply, and is this contract within them?
  • Is the builder's insurance in place for this job, and what does it cover?
  • Is the deposit within the legal limit, and does each progress payment follow completed work?
  • In a house-and-land package, what happens to the building contract if the land is delayed?

Official resources

Important limitations: This is general information comparing state rules, not legal advice about any contract or insurance policy. Insurance limits, exclusions and claim time limits apply in every state. The date on each citation is when Delora last checked that source; a building lawyer can say how the rules apply to your contract.

Sources and methodology

Figures on this page are drawn from Delora's local knowledge graph, refreshed from these primary sources and checked for changes on a regular schedule. If a figure here looks out of date, the official source above is always the authority — please let us know.

Evidence record

Written by
Delora editorial team
Jurisdiction
Victoria, New South Wales, Queensland, Western Australia and South Australia, compared; Tasmania, the ACT and the Northern Territory noted
Content type
Guide (general information, not legal advice)
Last reviewed
2026-11-05
Sources
See "Sources and methodology" above for cited sources

Keep reading