Delora

Moorabool planning changes

Every gazetted zoning and overlay change in Moorabool since 3 Oct 2017.

5changes allowing more housing
10changes allowing less housing
12overlay changes
21 May 2026most recent gazetted change

Every gazetted zoning and overlay change in Moorabool since 3 Oct 2017, grouped by suburb. Part of the statewide Victoria Rezoning Tracker.

Allows more housing, 13 Mar 2026Change between non-housing zones, 6 Mar 2020Schedule change (same zone), 6 Mar 2020Schedule change (same zone), 6 Mar 2020Allows less housing, 6 Mar 2020Allows less housing, 6 Mar 2020Schedule change (same zone), 11 Jun 2020Schedule change (same zone), 15 Nov 2018Allows less housing, 15 Nov 2018Allows less housing, 15 Nov 2018Schedule change (same zone), 15 Nov 2018Schedule change (same zone), 15 Nov 2018Allows less housing, 15 Nov 2018Allows less housing, 15 Nov 2018Schedule change (same zone), 15 Nov 2018Taken out of housing, 11 Jun 2020Allows more housing, 21 May 2026Opened to housing, 11 Jun 2020Taken out of housing, 15 Nov 2018Opened to housing, 11 Jun 2020Taken out of housing, 11 Jun 2020Opened to housing, 11 Jun 2020
More housingLess housingSchedule changeOther zone change

30 of 35 changes matched to a single amendment. See every amendment to this scheme →

Changes by suburb

Ballan (6, latest 13 Mar 2026)

Ballan suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Mar 2026Allows more housingBallanRLZ → NRZ10196.6 haAmendment C108moor
6 Mar 2020Change between non-housing zonesBallanIN2Z → IN1Z129.8 haAmendment C088moor
6 Mar 2020Schedule change (same zone)BallanGRZ1 → GRZ4498.2 haAmendment C088moor
6 Mar 2020Schedule change (same zone)BallanLDRZ → LDRZ1237.0 haAmendment C088moor
6 Mar 2020Allows less housingBallanGRZ1 → NRZ6363.8 haAmendment C088moor
6 Mar 2020Allows less housingBallanGRZ1 → NRZ7476.2 haAmendment C088moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Bacchus Marsh (5, latest 11 Jun 2020)

Bacchus Marsh suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Schedule change (same zone)Bacchus MarshGRZ1 → GRZ21111 haAmendment C086moor
15 Nov 2018Schedule change (same zone)Bacchus Marsh, Darley, MaddingleyGRZ1 → GRZ214897 haAmendment C079
15 Nov 2018Allows less housingBacchus MarshGRZ1 → NRZ317.3 haAmendment C079
15 Nov 2018Allows less housingBacchus MarshGRZ2 → NRZ4113.2 haAmendment C079
15 Nov 2018Schedule change (same zone)Bacchus MarshGRZ2 → GRZ3426.6 haAmendment C079

* dated by when the record took effect; no gazettal date within two weeks was found.

Darley (4, latest 15 Nov 2018)

Darley suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
15 Nov 2018Schedule change (same zone)Darley, Bacchus Marsh, MaddingleyGRZ1 → GRZ36149 haAmendment C079
15 Nov 2018Allows less housingDarleyGRZ1 → NRZ5227.4 haAmendment C079
15 Nov 2018Allows less housingDarleyGRZ1 → NRZ22151 haAmendment C079
15 Nov 2018Schedule change (same zone)DarleyLDRZ → LDRZ11132 haAmendment C079

* dated by when the record took effect; no gazettal date within two weeks was found.

Gordon (2, latest 11 Jun 2020)

Gordon suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Taken out of housingGordonRLZ → PUZ1199 m²Amendment C086moor
11 Jun 2020Taken out of housingGordon, 20568, 21684FZ → PUZ1346.7 haAmendment C086moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Hopetoun Park (1, latest 21 May 2026)

Hopetoun Park suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
21 May 2026Allows more housingHopetoun ParkFZ → NRZ8162.6 haAmendment C103moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Long Forest (1, latest 11 Jun 2020)

Long Forest suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Opened to housingLong ForestPCRZ → RCZ19.1 haAmendment C086moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Maddingley (1, latest 15 Nov 2018)

Maddingley suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
15 Nov 2018Taken out of housingMaddingleyGRZ1 → PPRZ27,035 m²Amendment C079

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 11 Jun 2020)
GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Opened to housing22726PUZ1 → FZ11,222 haAmendment C086moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 11 Jun 2020)
GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Taken out of housing20156RCZ → PUZ119.9 haAmendment C086moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 11 Jun 2020)
GazettedChangeSuburbZoneParcelsAreaAmendment
11 Jun 2020Opened to housing22317PCRZ → FZ1599 haAmendment C086moor

* dated by when the record took effect; no gazettal date within two weeks was found.

Overlay changes

GazettedChangeSuburbZoneParcelsAreaAmendment
8 May 2026New heritage controlBallan, 21684, Blackwood +5 moreHO113–Amendment C085moor
8 May 2026*Heritage control removedBallanHO1–See scheme amendments
14 Apr 2023New heritage control22039HO1–Amendment C101moor
14 Apr 2023*Heritage control removed22039HO1–See scheme amendments
18 Mar 2022New flood control21232, 20116, 20156 +19 moreLSIO192–Amendment C91moor
18 Mar 2022New flood controlDarley, Bacchus Marsh, BallanSBO7–Amendment C91moor
11 Jun 2020New heritage control22039, BallanHO2–Amendment C086moor
11 Jun 2020*Heritage control removed22039, BallanHO2–See scheme amendments
7 Nov 2019*Bushfire control removedBallanBMO1–See scheme amendments
24 Jan 2019Bushfire schedule changedCoimadai, DarleyBMO2–Amendment C90moor
7 Feb 2018*Heritage control removedDarleyHO1–See scheme amendments
3 Oct 2017New bushfire controlBlackwood, 20383, 20402 +25 moreBMO66–Amendment GC13

* dated by when the record took effect; no gazettal date within two weeks was found.

Filter these changes

Change type
GazettedChangeSuburbCouncilZoneParcelsArea

Method, dating and limits

Method. Delora's own method, not an official classification. Each zone family is ranked by how much housing it generally allows (rural 1, low-density 2, neighbourhood and township 3, general residential 4, residential growth and housing choice 5, mixed use and commercial 1 6, activity centre and precinct 7, urban growth 8). A change to a higher rank reads as allowing more housing, to a lower rank as allowing less. Moving land out of every ranked zone (for example into an industrial or public-use zone) counts as taken out of housing, and the reverse as opened to housing. Urban Growth land that receives its permanent zone once a precinct is built out is shown separately, not as a downzoning. A change of schedule within one zone (GRZ1 to GRZ2) can tighten or loosen the local rules, so it gets no verdict. Legacy recodes (R1Z to GRZ, RDZ to TRZ) and moves between road, rail and public-land zones are administrative and excluded from the counts.

How a change is dated. Where the service records a gazettal date for the new zone or overlay within two weeks of it taking effect, that gazettal date is shown. Otherwise the date the new record took effect is shown instead, and marked as such on the notice.

Amendment numbers. Matched to a notice when exactly one planning scheme amendment was gazetted for that council on that date; shown as ambiguous when several were, and never guessed. There is no amendment-number field in the source data itself.

  • FZ/RAZ/RCZ/GWZ/GWAZ/RUZ/RLZ — Rural and green-wedge zones: at most one dwelling on a large lot, often needing a permit.
  • LDRZ — Low Density Residential: houses on large lots (typically 0.4 ha or more) with limited subdivision.
  • NRZ/TZ — Neighbourhood Residential and Township: detached housing with limited growth; the most restrictive urban residential zones.
  • GRZ/R1Z/R2Z/R3Z — General Residential (and the pre-2014 Residential 1-3 codes it replaced): moderate growth such as townhouses and dual occupancies.
  • RGZ/HCTZ — Residential Growth, and Housing Choice and Transport: zones designated for more housing, with apartments and greater height.
  • MUZ/C1Z/B1Z/B2Z/B5Z/CDZ/PDZ/CCZ/DZ — Mixed use, Commercial 1 and the comprehensive or precinct zones: apartments above or beside other uses, usually in centres.
  • ACZ/PRZ — Activity Centre and Precinct: the highest-density urban zones, applied to major centres and precincts planned for intensive change.
  • UGZ/UFZ — Urban Growth: greenfield land being turned into whole new suburbs under a precinct structure plan.

Honest limits.

  • Zone-polygon history runs from 30 Jul 2017 onwards; earlier changes are gazettal records only, without a mapped boundary.
  • Overlay history covers heritage, floodway, land subject to inundation, special building and bushfire management only — not every overlay type in the planning scheme.
  • This shows the zone or overlay that applies. It does not say what a planning permit will allow — that depends on the zone schedule, any overlay and the specific proposal.
  • The up/down classification is Delora’s own method, not an official one.