Every gazetted zoning and overlay change in Hepburn since 17 Aug 2017.

0changes allowing more housing
3changes allowing less housing
12overlay changes
31 Mar 2022most recent gazetted change

Every gazetted zoning and overlay change in Hepburn since 17 Aug 2017, grouped by suburb. Part of the statewide Victoria Rezoning Tracker.

Rezoned, similar housing capacity, 10 Feb 2022Schedule change (same zone), 10 Feb 2022Schedule change (same zone), 10 Feb 2022Taken out of housing, 10 Feb 2022Allows less housing, 10 Feb 2022Schedule change (same zone), 10 Feb 2022Rezoned, similar housing capacity, 10 Feb 2022Schedule change (same zone), 10 Feb 2022Schedule change (same zone), 10 Feb 2022Schedule change (same zone), 10 Feb 2022Allows less housing, 10 Feb 2022Schedule change (same zone), 10 Feb 2022Schedule change (same zone), 10 Feb 2022
Less housingSchedule changeOther zone change

22 of 25 changes matched to a single amendment. See every amendment to this scheme →

Changes by suburb

Clunes (3, latest 10 Feb 2022)

Clunes suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Rezoned, similar housing capacityClunesTZ → NRZ215171 haAmendment C80hepb
10 Feb 2022Schedule change (same zone)Clunes, 20029, 20438 +14 moreFZ → FZ13061,186 haAmendment C80hepb
10 Feb 2022Schedule change (same zone)Clunes, 20029, 22225 +8 moreLDRZ → LDRZ1381,881 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Daylesford (2, latest 10 Feb 2022)

Daylesford suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Taken out of housingDaylesfordGRZ1 → PPRZ11.3 haAmendment C80hepb
10 Feb 2022Allows less housingDaylesford, Hepburn SpringsGRZ1 → NRZ121326 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Trentham (2, latest 10 Feb 2022)

Trentham suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)TrenthamRLZ → RLZ2117.8 haAmendment C80hepb
10 Feb 2022Rezoned, similar housing capacityTrenthamTZ → NRZ312148 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Broomfield (1, latest 10 Feb 2022)

Broomfield suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)Broomfield, 20438, 20807 +3 moreRCZ → RCZ182,367 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Creswick (1, latest 10 Feb 2022)

Creswick suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)Creswick, 20163, 20384 +19 moreRLZ → RLZ1665,621 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Glenlyon (1, latest 10 Feb 2022)

Glenlyon suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)Glenlyon, 20029, 20384 +7 moreTZ → TZ122506 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Hepburn (1, latest 10 Feb 2022)

Hepburn suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Allows less housingHepburn, 20853, Hepburn SpringsGRZ1 → NRZ49136 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 10 Feb 2022)
GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)22274, 20163, 20801 +11 moreRCZ → RCZ227455 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 10 Feb 2022)
GazettedChangeSuburbZoneParcelsAreaAmendment
10 Feb 2022Schedule change (same zone)22101, 20163, 20384 +25 moreFZ → FZ27238,242 haAmendment C80hepb

* dated by when the record took effect; no gazettal date within two weeks was found.

Overlay changes

GazettedChangeSuburbZoneParcelsAreaAmendment
31 Mar 2022Flood schedule changedClunes, 20584, 21390 +9 moreLSIO18–Amendment C77hepb
31 Mar 2022New flood controlCreswick, ClunesLSIO169–Amendment C77hepb
10 Feb 2022New heritage control21519, TrenthamHO6–Amendment C80hepb
10 Feb 2022Flood schedule changedClunes, 20584, 21390 +9 moreLSIO17–Amendment C80hepb
20 Nov 2020New heritage controlCreswickHO1–Amendment C83hepb
20 Nov 2020*Heritage control removed20438, CreswickHO2–See scheme amendments
10 Sep 2020New heritage controlHepburnHO1–Amendment C79hepb
7 Nov 2019*Bushfire control removedCreswickBMO1–See scheme amendments
3 Oct 2017New bushfire controlGlenlyon, 20029, 20459 +25 moreBMO74–Amendment GC13
17 Aug 2017*Heritage control removed21364HO1–See scheme amendments
17 Aug 2017New heritage controlCreswick, Drummond NorthHO3–Amendment C067
17 Aug 2017Heritage schedule changed21364HO1–Amendment C067

* dated by when the record took effect; no gazettal date within two weeks was found.

Filter these changes

Change type
GazettedChangeSuburbCouncilZoneParcelsArea

Method, dating and limits

Method. Delora's own method, not an official classification. Each zone family is ranked by how much housing it generally allows (rural 1, low-density 2, neighbourhood and township 3, general residential 4, residential growth and housing choice 5, mixed use and commercial 1 6, activity centre and precinct 7, urban growth 8). A change to a higher rank reads as allowing more housing, to a lower rank as allowing less. Moving land out of every ranked zone (for example into an industrial or public-use zone) counts as taken out of housing, and the reverse as opened to housing. Urban Growth land that receives its permanent zone once a precinct is built out is shown separately, not as a downzoning. A change of schedule within one zone (GRZ1 to GRZ2) can tighten or loosen the local rules, so it gets no verdict. Legacy recodes (R1Z to GRZ, RDZ to TRZ) and moves between road, rail and public-land zones are administrative and excluded from the counts.

How a change is dated. Where the service records a gazettal date for the new zone or overlay within two weeks of it taking effect, that gazettal date is shown. Otherwise the date the new record took effect is shown instead, and marked as such on the notice.

Amendment numbers. Matched to a notice when exactly one planning scheme amendment was gazetted for that council on that date; shown as ambiguous when several were, and never guessed. There is no amendment-number field in the source data itself.

  • FZ/RAZ/RCZ/GWZ/GWAZ/RUZ/RLZ — Rural and green-wedge zones: at most one dwelling on a large lot, often needing a permit.
  • LDRZ — Low Density Residential: houses on large lots (typically 0.4 ha or more) with limited subdivision.
  • NRZ/TZ — Neighbourhood Residential and Township: detached housing with limited growth; the most restrictive urban residential zones.
  • GRZ/R1Z/R2Z/R3Z — General Residential (and the pre-2014 Residential 1-3 codes it replaced): moderate growth such as townhouses and dual occupancies.
  • RGZ/HCTZ — Residential Growth, and Housing Choice and Transport: zones designated for more housing, with apartments and greater height.
  • MUZ/C1Z/B1Z/B2Z/B5Z/CDZ/PDZ/CCZ/DZ — Mixed use, Commercial 1 and the comprehensive or precinct zones: apartments above or beside other uses, usually in centres.
  • ACZ/PRZ — Activity Centre and Precinct: the highest-density urban zones, applied to major centres and precincts planned for intensive change.
  • UGZ/UFZ — Urban Growth: greenfield land being turned into whole new suburbs under a precinct structure plan.

Honest limits.

  • Zone-polygon history runs from 30 Jul 2017 onwards; earlier changes are gazettal records only, without a mapped boundary.
  • Overlay history covers heritage, floodway, land subject to inundation, special building and bushfire management only — not every overlay type in the planning scheme.
  • This shows the zone or overlay that applies. It does not say what a planning permit will allow — that depends on the zone schedule, any overlay and the specific proposal.
  • The up/down classification is Delora’s own method, not an official one.