Delora

Mildura planning changes

Every gazetted zoning and overlay change in Mildura since 3 Oct 2017.

3changes allowing more housing
3changes allowing less housing
8overlay changes
16 May 2024most recent gazetted change

Every gazetted zoning and overlay change in Mildura since 3 Oct 2017, grouped by suburb. Part of the statewide Victoria Rezoning Tracker.

Schedule change (same zone), 24 Mar 2023Schedule change (same zone), 24 Mar 2023Opened to housing, 13 Oct 2022Schedule change (same zone), 24 Mar 2023Schedule change (same zone), 24 Mar 2023Schedule change (same zone), 24 Mar 2023Opened to housing, 24 Mar 2023Taken out of housing, 24 Mar 2023Opened to housing, 13 Oct 2022Taken out of housing, 24 Mar 2023
More housingLess housingSchedule change

18 of 20 changes matched to a single amendment. See every amendment to this scheme →

Changes by suburb

Irymple (2, latest 24 Mar 2023)

Irymple suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Schedule change (same zone)IrympleMUZ → MUZ313.5 haAmendment C104mild
24 Mar 2023Schedule change (same zone)IrympleMUZ → MUZ216.7 haAmendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Merbein (2, latest 13 Oct 2022)

Merbein suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Oct 2022Opened to housingMerbeinPUZ2 → GRZ116.6 haAmendment C113mild
6 Feb 2020Schedule change (same zone)MerbeinPUZ4 → PUZ11134 m²Amendment C102mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Mildura (2, latest 24 Mar 2023)

Mildura suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Schedule change (same zone)MilduraMUZ → MUZ1116.5 haAmendment C104mild
24 Mar 2023Taken out of housingMilduraGRZ1 → PUZ61906 m²Amendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Ouyen (2, latest 24 Mar 2023)

Ouyen suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Schedule change (same zone)Ouyen, 21712, 22667 +1 morePUZ1 → PUZ6421.6 haAmendment C104mild
24 Mar 2023Schedule change (same zone)Ouyen, 20656, 20692 +13 moreTZ → TZ142987 haAmendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Cardross (1, latest 24 Mar 2023)

Cardross suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Opened to housingCardross, YeltaPCRZ → RCZ4241.6 haAmendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Colignan (1, latest 24 Mar 2023)

Colignan suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Taken out of housingColignanFZ → PUZ611.5 haAmendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Merbein West (1, latest 13 Oct 2022)

Merbein West suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
13 Oct 2022Opened to housingMerbein WestPUZ2 → RLZ13.2 haAmendment C113mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 24 Mar 2023)
GazettedChangeSuburbZoneParcelsAreaAmendment
24 Mar 2023Taken out of housing22752, 20656TZ → PUZ621.4 haAmendment C104mild

* dated by when the record took effect; no gazettal date within two weeks was found.

Overlay changes

GazettedChangeSuburbZoneParcelsAreaAmendment
16 May 2024New heritage controlRed CliffsHO1–Amendment C124mild
24 Mar 2023Heritage schedule changedMilduraHO3–Amendment C104mild
24 Mar 2023*Heritage control removedNichols Point, Merbein, MilduraHO13–See scheme amendments
24 Mar 2023New heritage controlNichols Point, Merbein, MilduraHO6–Amendment C104mild
21 Jul 2022New flood control20692, 12684, 21146 +7 moreFO20–Amendment C106mild
21 Jul 2022New flood control22691, 20692, 21146 +14 moreLSIO107–Amendment C106mild
21 Jul 2022*Flood control removed20692, 21146, 21239 +7 moreLSIO12–See scheme amendments
3 Oct 2017New bushfire control21843, 20234, 20269 +32 moreBMO266–Amendment GC13

* dated by when the record took effect; no gazettal date within two weeks was found.

Filter these changes

Change type
GazettedChangeSuburbCouncilZoneParcelsArea

Method, dating and limits

Method. Delora's own method, not an official classification. Each zone family is ranked by how much housing it generally allows (rural 1, low-density 2, neighbourhood and township 3, general residential 4, residential growth and housing choice 5, mixed use and commercial 1 6, activity centre and precinct 7, urban growth 8). A change to a higher rank reads as allowing more housing, to a lower rank as allowing less. Moving land out of every ranked zone (for example into an industrial or public-use zone) counts as taken out of housing, and the reverse as opened to housing. Urban Growth land that receives its permanent zone once a precinct is built out is shown separately, not as a downzoning. A change of schedule within one zone (GRZ1 to GRZ2) can tighten or loosen the local rules, so it gets no verdict. Legacy recodes (R1Z to GRZ, RDZ to TRZ) and moves between road, rail and public-land zones are administrative and excluded from the counts.

How a change is dated. Where the service records a gazettal date for the new zone or overlay within two weeks of it taking effect, that gazettal date is shown. Otherwise the date the new record took effect is shown instead, and marked as such on the notice.

Amendment numbers. Matched to a notice when exactly one planning scheme amendment was gazetted for that council on that date; shown as ambiguous when several were, and never guessed. There is no amendment-number field in the source data itself.

  • FZ/RAZ/RCZ/GWZ/GWAZ/RUZ/RLZ — Rural and green-wedge zones: at most one dwelling on a large lot, often needing a permit.
  • LDRZ — Low Density Residential: houses on large lots (typically 0.4 ha or more) with limited subdivision.
  • NRZ/TZ — Neighbourhood Residential and Township: detached housing with limited growth; the most restrictive urban residential zones.
  • GRZ/R1Z/R2Z/R3Z — General Residential (and the pre-2014 Residential 1-3 codes it replaced): moderate growth such as townhouses and dual occupancies.
  • RGZ/HCTZ — Residential Growth, and Housing Choice and Transport: zones designated for more housing, with apartments and greater height.
  • MUZ/C1Z/B1Z/B2Z/B5Z/CDZ/PDZ/CCZ/DZ — Mixed use, Commercial 1 and the comprehensive or precinct zones: apartments above or beside other uses, usually in centres.
  • ACZ/PRZ — Activity Centre and Precinct: the highest-density urban zones, applied to major centres and precincts planned for intensive change.
  • UGZ/UFZ — Urban Growth: greenfield land being turned into whole new suburbs under a precinct structure plan.

Honest limits.

  • Zone-polygon history runs from 30 Jul 2017 onwards; earlier changes are gazettal records only, without a mapped boundary.
  • Overlay history covers heritage, floodway, land subject to inundation, special building and bushfire management only — not every overlay type in the planning scheme.
  • This shows the zone or overlay that applies. It does not say what a planning permit will allow — that depends on the zone schedule, any overlay and the specific proposal.
  • The up/down classification is Delora’s own method, not an official one.