Delora

Latrobe planning changes

Every gazetted zoning and overlay change in Latrobe since 3 Aug 2017.

10changes allowing more housing
43changes allowing less housing
13overlay changes
2 Oct 2025most recent gazetted change

Every gazetted zoning and overlay change in Latrobe since 3 Aug 2017, grouped by suburb. Part of the statewide Victoria Rezoning Tracker.

Schedule change (same zone), 2 Oct 2025Schedule change (same zone), 2 Oct 2025Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Taken out of housing, 9 Jul 2020Taken out of housing, 9 Jul 2020Taken out of housing, 9 Jul 2020Taken out of housing, 7 Nov 2019Schedule change (same zone), 7 Nov 2019Schedule change (same zone), 7 Nov 2019Schedule change (same zone), 7 Nov 2019Allows less housing, 7 Nov 2019Allows more housing, 7 Nov 2019Allows more housing, 7 Nov 2019Schedule change (same zone), 7 Feb 2019Allows more housing, 7 Feb 2019Allows more housing, 7 Feb 2019Taken out of housing, 22 Nov 2018Taken out of housing, 23 Aug 2018Taken out of housing, 23 Aug 2018Taken out of housing, 3 Aug 2017Allows more housing, 7 Dec 2023Allows more housing, 2 Jun 2023Schedule change (same zone), 2 Jun 2023Allows more housing, 2 Jun 2023Taken out of housing, 9 Jul 2020Rezoned, similar housing capacity, 7 Nov 2019Allows more housing, 7 Nov 2019Taken out of housing, 2 Oct 2025Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Allows less housing, 7 Nov 2019Schedule change (same zone), 7 Nov 2019Taken out of housing, 2 Nov 2017Taken out of housing, 3 Aug 2017Taken out of housing, 29 Aug 2024Taken out of housing, 29 Aug 2024Schedule change (same zone), 7 Nov 2019Schedule change (same zone), 7 Nov 2019Taken out of housing, 3 Aug 2017Allows more housing, 29 Jun 2023Taken out of housing, 29 Jun 2023Schedule change (same zone), 29 Jun 2023Allows less housing, 29 Jun 2023Taken out of housing, 7 Nov 2019Change between non-housing zones, 2 Oct 2025Taken out of housing, 2 Oct 2025Schedule change (same zone), 7 Nov 2019Taken out of housing, 23 Aug 2018Change between non-housing zones, 2 Oct 2025Change between non-housing zones, 29 Aug 2024Change between non-housing zones, 29 Aug 2024Allows less housing, 7 Nov 2019Schedule change (same zone), 2 Oct 2025Schedule change (same zone), 7 Nov 2019Taken out of housing, 2 Nov 2017Taken out of housing, 3 Aug 2017Schedule change (same zone), 2 Oct 2025Schedule change (same zone), 7 Nov 2019Schedule change (same zone), 7 Nov 2019Taken out of housing, 3 Aug 2017Rezoned, similar housing capacity, 7 Dec 2020Schedule change (same zone), 7 Nov 2019Rezoned, similar housing capacity, 7 Nov 2019Taken out of housing, 2 Nov 2017Schedule change (same zone), 7 Nov 2019Taken out of housing, 23 Aug 2018Allows more housing, 2 Nov 2017Schedule change (same zone), 7 Nov 2019Taken out of housing, 23 Aug 2018Taken out of housing, 7 Nov 2019Allows less housing, 7 Nov 2019Taken out of housing, 3 Aug 2017Schedule change (same zone), 7 Nov 2019Taken out of housing, 7 Nov 2019Schedule change (same zone), 7 Nov 2019Schedule change (same zone), 2 Oct 2025Schedule change (same zone), 7 Nov 2019Rezoned, similar housing capacity, 7 Nov 2019Taken out of housing, 2 Nov 2017Schedule change (same zone), 7 Nov 2019
More housingLess housingSchedule changeOther zone change

59 of 100 changes matched to a single amendment, 4 ambiguous. See every amendment to this scheme →

Changes by suburb

Traralgon (25, latest 2 Oct 2025)

Traralgon suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Schedule change (same zone)Traralgon, Churchill, Moe +3 moreMUZ → MUZ13841.1 haAmendment C149latr
2 Oct 2025Schedule change (same zone)Traralgon, Boolarra, Churchill +2 moreLDRZ → LDRZ115378 haAmendment C149latr
29 Aug 2024Taken out of housingTraralgon, Glengarry, MoeGRZ3 → PPRZ187.9 haAmendment C132latr
29 Aug 2024Taken out of housingTraralgonFZ1 → PPRZ16,258 m²Amendment C132latr
29 Aug 2024Taken out of housingTraralgon, TyersLDRZ → PPRZ32.4 haAmendment C132latr
29 Aug 2024Taken out of housingTraralgon, Churchill, Moe +2 moreNRZ4 → PPRZ178.9 haAmendment C132latr
29 Aug 2024Taken out of housingTraralgonGRZ1 → PPRZ1964 m²Amendment C132latr
29 Aug 2024Taken out of housingTraralgonC1Z → PPRZ11,981 m²Amendment C132latr
9 Jul 2020Taken out of housingTraralgonRLZ1 → PUZ312.3 ha2 amendments gazetted that day
9 Jul 2020Taken out of housingTraralgonRLZ2 → SUZ8232.0 ha2 amendments gazetted that day
9 Jul 2020Taken out of housingTraralgonRLZ2 → PUZ312.3 ha2 amendments gazetted that day
7 Nov 2019Taken out of housingTraralgonGRZ1 → PPRZ11.4 haSee scheme amendments
7 Nov 2019Schedule change (same zone)Traralgon, 22893, Churchill +5 moreGRZ1 → GRZ3231,233 haSee scheme amendments
7 Nov 2019Schedule change (same zone)TraralgonGRZ1 → GRZ2583.6 haSee scheme amendments
7 Nov 2019Schedule change (same zone)Traralgon, Moe, MorwellRGZ1 → RGZ21814.7 haSee scheme amendments
7 Nov 2019Allows less housingTraralgon, 22893, Boolarra +9 moreGRZ1 → NRZ4732,309 haSee scheme amendments
7 Nov 2019Allows more housingTraralgonGRZ1 → RGZ1112.7 haSee scheme amendments
7 Nov 2019Allows more housingTraralgonGRZ1 → RGZ2222.6 haSee scheme amendments
7 Feb 2019Schedule change (same zone)TraralgonACZ → ACZ1848.6 haAmendment C106Pt2latr
7 Feb 2019Allows more housingTraralgonC1Z → ACZ644.4 haAmendment C106Pt2latr
7 Feb 2019Allows more housingTraralgonMUZ → ACZ11.1 haAmendment C106Pt2latr
22 Nov 2018Taken out of housingTraralgonGRZ1 → PPRZ14,966 m²Amendment C112latr
23 Aug 2018Taken out of housingTraralgonGRZ1 → PUZ119,832 m²Amendment C108
23 Aug 2018Taken out of housingTraralgonGRZ1 → PCRZ23.3 haAmendment C108
3 Aug 2017Taken out of housingTraralgon, Boolarra, Churchill +8 moreGRZ1 → PPRZ202105 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Morwell (8, latest 2 Oct 2025)

Morwell suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Change between non-housing zonesMorwellIN3Z → PUZ11153 m²Amendment C149latr
7 Dec 2023Allows more housingMorwellRGZ3 → MUZ14,264 m²Amendment C146latr
2 Jun 2023Allows more housingMorwellC1Z → ACZ2120.8 haAmendment C137latr
2 Jun 2023Schedule change (same zone)MorwellRGZ1 → RGZ318,900 m²Amendment C137latr
2 Jun 2023Allows more housingMorwellMUZ → ACZ2315.8 haAmendment C137latr
9 Jul 2020Taken out of housingMorwellRLZ1 → SUZ811.5 ha2 amendments gazetted that day
7 Nov 2019Rezoned, similar housing capacityMorwellFZ → RLZ111.4 haSee scheme amendments
7 Nov 2019Allows more housingMorwellGRZ1 → RGZ3421.7 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Churchill (7, latest 2 Oct 2025)

Churchill suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Taken out of housingChurchillNRZ4 → PUZ11530 m²Amendment C149latr
29 Aug 2024Taken out of housingChurchillMUZ → PPRZ1982 m²Amendment C132latr
29 Aug 2024Taken out of housingChurchillRGZ4 → PPRZ12,668 m²Amendment C132latr
7 Nov 2019Allows less housingChurchillRGZ1 → GRZ1115.5 haSee scheme amendments
7 Nov 2019Schedule change (same zone)ChurchillRGZ1 → RGZ419.2 haSee scheme amendments
2 Nov 2017Taken out of housingChurchill, Traralgon, Traralgon EastGRZ1 → PUZ142,636 m²Amendment C100
3 Aug 2017Taken out of housingChurchillRLZ3 → PPRZ12.0 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Moe (5, latest 29 Aug 2024)

Moe suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
29 Aug 2024Taken out of housingMoeRGZ3 → PPRZ18,284 m²Amendment C132latr
29 Aug 2024Taken out of housingMoeRLZ3 → PPRZ16,689 m²Amendment C132latr
7 Nov 2019Schedule change (same zone)Moe, MorwellRGZ1 → RGZ3755.9 haSee scheme amendments
7 Nov 2019Schedule change (same zone)Moe, TraralgonRLZ5 → RLZ2296.5 haSee scheme amendments
3 Aug 2017Taken out of housingMoeRGZ1 → PPRZ11.3 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Toongabbie (5, latest 29 Jun 2023)

Toongabbie suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
29 Jun 2023Allows more housingToongabbieNRZ4 → GRZ441.6 haAmendment C126latr
29 Jun 2023Taken out of housingToongabbieFZ1 → PCRZ416.6 haAmendment C126latr
29 Jun 2023Schedule change (same zone)ToongabbieNRZ4 → NRZ5377.5 haAmendment C126latr
29 Jun 2023Allows less housingToongabbieNRZ4 → LDRZ213.7 haAmendment C126latr
7 Nov 2019Taken out of housingToongabbie, 20122, 20289 +10 moreFZ → PCRZ257,406 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Hazelwood North (4, latest 2 Oct 2025)

Hazelwood North suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Change between non-housing zonesHazelwood NorthIN2Z → PUZ111.7 haAmendment C149latr
2 Oct 2025Taken out of housingHazelwood North, 20289, TraralgonFZ1 → PUZ145.6 haAmendment C149latr
7 Nov 2019Schedule change (same zone)Hazelwood NorthRLZ6 → RLZ2146.1 haSee scheme amendments
23 Aug 2018Taken out of housingHazelwood North, Traralgon EastRLZ3 → PPRZ28.2 haAmendment C108

* dated by when the record took effect; no gazettal date within two weeks was found.

Traralgon East (4, latest 2 Oct 2025)

Traralgon East suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Change between non-housing zonesTraralgon EastIN1Z → PUZ115,491 m²Amendment C149latr
29 Aug 2024Change between non-housing zonesTraralgon EastIN1Z → PPRZ15,073 m²Amendment C132latr
29 Aug 2024Change between non-housing zonesTraralgon EastIN3Z → PPRZ11,433 m²Amendment C132latr
7 Nov 2019Allows less housingTraralgon East, Churchill, Moe +1 moreGRZ1 → NRZ3475.6 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Traralgon South (4, latest 2 Oct 2025)

Traralgon South suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Schedule change (same zone)Traralgon South, Boolarra, Glengarry +4 moreTZ → TZ115111 haAmendment C149latr
7 Nov 2019Schedule change (same zone)Traralgon South, Moe, Yinnar SouthRLZ6 → RLZ34278 haSee scheme amendments
2 Nov 2017Taken out of housingTraralgon SouthTZ → PUZ11493 m²Amendment C100
3 Aug 2017Taken out of housingTraralgon South, TraralgonFZ → PPRZ213.5 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Tyers (4, latest 2 Oct 2025)

Tyers suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Schedule change (same zone)TyersRCZ → RCZ2140.1 haAmendment C149latr
7 Nov 2019Schedule change (same zone)Tyers, Moe, TraralgonRLZ2 → RLZ1446.2 haSee scheme amendments
7 Nov 2019Schedule change (same zone)Tyers, Boolarra, Callignee +5 moreRLZ4 → RLZ2181,779 haSee scheme amendments
3 Aug 2017Taken out of housingTyers, Yallourn North, YinnarTZ → PPRZ42.8 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Yinnar South (4, latest 7 Dec 2020)

Yinnar South suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Dec 2020Rezoned, similar housing capacityYinnar SouthFZ2 → RLZ1310.1 haAmendment C125latr
7 Nov 2019Schedule change (same zone)Yinnar SouthRLZ4 → RLZ3231.8 haSee scheme amendments
7 Nov 2019Rezoned, similar housing capacityYinnar SouthRLZ4 → FZ23605 haSee scheme amendments
2 Nov 2017Taken out of housingYinnar SouthRLZ4 → PCRZ12.0 haAmendment C100

* dated by when the record took effect; no gazettal date within two weeks was found.

Boolarra (3, latest 7 Nov 2019)

Boolarra suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)Boolarra, 21027, NewboroughRLZ6 → RLZ1538.7 haSee scheme amendments
23 Aug 2018Taken out of housingBoolarra, MorwellFZ → PPRZ266.1 haAmendment C108
2 Nov 2017Allows more housingBoolarraFZ → TZ12.5 haAmendment C100

* dated by when the record took effect; no gazettal date within two weeks was found.

Moe South (3, latest 7 Nov 2019)

Moe South suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)Moe SouthRLZ5 → RLZ1143.3 haSee scheme amendments
23 Aug 2018Taken out of housingMoe South, Yallourn NorthFZ → PUZ121,381 m²Amendment C108
2 Nov 2017Taken out of housingMoe SouthRLZ5 → PUZ11103 m²Amendment C100

* dated by when the record took effect; no gazettal date within two weeks was found.

Newborough (3, latest 7 Nov 2019)

Newborough suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Taken out of housingNewboroughGRZ1 → PUZ2110.8 haSee scheme amendments
7 Nov 2019Allows less housingNewborough, MoeGRZ1 → NRZ2215.5 haSee scheme amendments
3 Aug 2017Taken out of housingNewboroughNRZ1 → PPRZ51.7 haAmendment C091

* dated by when the record took effect; no gazettal date within two weeks was found.

Jeeralang Junction (2, latest 7 Nov 2019)

Jeeralang Junction suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)Jeeralang Junction, 21260, Boolarra +12 moreRLZ3 → RLZ1323,986 haSee scheme amendments
7 Nov 2019Taken out of housingJeeralang JunctionRLZ3 → PCRZ11.1 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Callignee (1, latest 7 Nov 2019)

Callignee suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)Callignee, Hernes Oak, Moe +4 moreFZ → FZ2142,582 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Tanjil South (1, latest 2 Oct 2025)

Tanjil South suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
2 Oct 2025Schedule change (same zone)Tanjil SouthRCZ → RCZ1143.8 haAmendment C149latr

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 7 Nov 2019)
GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)21260, 20289, 20733 +26 moreFZ → FZ19287,637 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 7 Nov 2019)
GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Rezoned, similar housing capacity20373FZ → RLZ213.1 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Unassigned land (1, latest 2 Nov 2017)
GazettedChangeSuburbZoneParcelsAreaAmendment
2 Nov 2017Taken out of housing21621, TraralgonFZ → PUZ1210.2 haAmendment C100

* dated by when the record took effect; no gazettal date within two weeks was found.

Yallourn North (1, latest 7 Nov 2019)

Yallourn North suburb page →

GazettedChangeSuburbZoneParcelsAreaAmendment
7 Nov 2019Schedule change (same zone)Yallourn North, GlengarryGRZ1 → GRZ4531.2 haSee scheme amendments

* dated by when the record took effect; no gazettal date within two weeks was found.

Overlay changes

GazettedChangeSuburbZoneParcelsAreaAmendment
5 Feb 2025*Flood control removedChurchillLSIO1–See scheme amendments
20 Dec 2024New flood controlGlengarry, 21027, 21621 +9 moreLSIO524–Amendment C131latr
20 Dec 2024*Flood control removedHazelwood North, Morwell, Tanjil SouthFO4–See scheme amendments
20 Dec 2024*Flood control removedYallourn North, 20933, 21027 +13 moreLSIO527–See scheme amendments
29 Jun 2023*Flood control removedToongabbieLSIO2–See scheme amendments
29 Jun 2023New flood controlToongabbieLSIO9–Amendment C126latr
29 Jun 2023New flood controlToongabbieFO14–Amendment C126latr
20 Apr 2023Heritage schedule changedTraralgonHO1–Amendment C140latr
22 Nov 2018New heritage controlChurchillHO1–Amendment C112latr
21 Nov 2018*Heritage control removedChurchillHO1–See scheme amendments
7 Jun 2018New heritage controlMorwellHO1–Amendment C110
1 Nov 2017*Heritage control removedMoeHO1–See scheme amendments
3 Oct 2017New bushfire control21260, 20289, 20786 +19 moreBMO58–Amendment GC13

* dated by when the record took effect; no gazettal date within two weeks was found.

Filter these changes

Change type
GazettedChangeSuburbCouncilZoneParcelsArea

Method, dating and limits

Method. Delora's own method, not an official classification. Each zone family is ranked by how much housing it generally allows (rural 1, low-density 2, neighbourhood and township 3, general residential 4, residential growth and housing choice 5, mixed use and commercial 1 6, activity centre and precinct 7, urban growth 8). A change to a higher rank reads as allowing more housing, to a lower rank as allowing less. Moving land out of every ranked zone (for example into an industrial or public-use zone) counts as taken out of housing, and the reverse as opened to housing. Urban Growth land that receives its permanent zone once a precinct is built out is shown separately, not as a downzoning. A change of schedule within one zone (GRZ1 to GRZ2) can tighten or loosen the local rules, so it gets no verdict. Legacy recodes (R1Z to GRZ, RDZ to TRZ) and moves between road, rail and public-land zones are administrative and excluded from the counts.

How a change is dated. Where the service records a gazettal date for the new zone or overlay within two weeks of it taking effect, that gazettal date is shown. Otherwise the date the new record took effect is shown instead, and marked as such on the notice.

Amendment numbers. Matched to a notice when exactly one planning scheme amendment was gazetted for that council on that date; shown as ambiguous when several were, and never guessed. There is no amendment-number field in the source data itself.

  • FZ/RAZ/RCZ/GWZ/GWAZ/RUZ/RLZ — Rural and green-wedge zones: at most one dwelling on a large lot, often needing a permit.
  • LDRZ — Low Density Residential: houses on large lots (typically 0.4 ha or more) with limited subdivision.
  • NRZ/TZ — Neighbourhood Residential and Township: detached housing with limited growth; the most restrictive urban residential zones.
  • GRZ/R1Z/R2Z/R3Z — General Residential (and the pre-2014 Residential 1-3 codes it replaced): moderate growth such as townhouses and dual occupancies.
  • RGZ/HCTZ — Residential Growth, and Housing Choice and Transport: zones designated for more housing, with apartments and greater height.
  • MUZ/C1Z/B1Z/B2Z/B5Z/CDZ/PDZ/CCZ/DZ — Mixed use, Commercial 1 and the comprehensive or precinct zones: apartments above or beside other uses, usually in centres.
  • ACZ/PRZ — Activity Centre and Precinct: the highest-density urban zones, applied to major centres and precincts planned for intensive change.
  • UGZ/UFZ — Urban Growth: greenfield land being turned into whole new suburbs under a precinct structure plan.

Honest limits.

  • Zone-polygon history runs from 30 Jul 2017 onwards; earlier changes are gazettal records only, without a mapped boundary.
  • Overlay history covers heritage, floodway, land subject to inundation, special building and bushfire management only — not every overlay type in the planning scheme.
  • This shows the zone or overlay that applies. It does not say what a planning permit will allow — that depends on the zone schedule, any overlay and the specific proposal.
  • The up/down classification is Delora’s own method, not an official one.